Description of manner in which massed bridge gangs on Missouri Pacific Lines in Texas and Louisiana, employing highly effective methods and equipment, rebuilt 72 panels of 142-panel treated pile bridge, adequate for train movements, in 150 hr, completing work later under traffic; how tractor bulldozer was used most effectively in clearing away debris and for transporting materials for rebuilding operations.
Gangs set enviable record in rebuilding long burned-out bridge
Ry Eng Maintenance
Railway Engineering and Maintenance ; 40 , n 9
1944
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Interferry's enviable problems: Success brings its own difficulties
British Library Online Contents | 1998
IuD Bahn | 2011
|Rebuilding CSXT's Ninemile Bridge
Online Contents | 1997
Rebuilding CSXT's Ninemile Bridge
IuD Bahn | 1997
|Mercedes:Une place enviable sur le marchee francais du BTP
Kraftfahrwesen | 1995
|