Details of signaling replacement and expansion program completed by Chicago, Rock Island and Pacific Railroad on 165 mi of double track main line between Blue Island, Ill, and Rock Island, Ill; purpose of this program was to replace obsolete systems of signaling with most modern systems as means of increasing track capacity and reducing train delays. (See also - n 4 Apr 1944 p 198-207; Ry Age v 116 n 25 June 17 1944 p 1173-7)
Rock Island installs cab signaling and centralized traffic control
Ry Signaling
Railway Signaling ; 37 , n 5
1944
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock Island installs cab signaling and centralized traffic control
Engineering Index Backfile | 1944
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Canadian pacific installs centralized traffic control
Engineering Index Backfile | 1944
Delaware and Hudson installs centralized traffic control
Engineering Index Backfile | 1937