Report on proposed underground rapid transit system for Montreal, as presented by Montreal Tramways Co to Greater Montreal Economic Council; initially, North-South subway following St Lawrence Blvd, and east-west subway following St Catherine Street, are proposed, with complete costs of $37,949,000 for north-south tube, with equipment, and of $22,866,000 for east-west tube, with equipment.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Report on subways for Montreal


    Weitere Titelangaben:

    Can Transportation


    Beteiligte:
    Watt, R.N. (Autor:in)


    Erscheinungsdatum :

    1944


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Rapid transit subways for Montreal

    Engineering Index Backfile | 1945



    Subways?

    Kremer | Engineering Index Backfile | 1931


    Subways

    Engineering Index Backfile | 1929


    Subways

    Engineering Index Backfile | 1928