H Bouchard. Describes practice on the Nord Railway, France. (2200 w.) (No. 23418 D)
The extraction and consolidation of broken Flint for ballast
L'Extraction et le Concassage mecaniques du Ballast en Silex
1911
Ills.
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
|Physical testing of broken-stone ballast
Engineering Index Backfile | 1912
|The Effects of Accelerated Ballast Consolidation
NTIS | 1977
|Track laying on rolled broken-stone ballast
Engineering Index Backfile | 1926
|Taylor & Francis Verlag | 2016
|