Central of Georgia installed new butt welded rails with rubber pads placed above and below tie plates in two tunnels in effort to lick problem of corrosion and excessive mechanical wear of ties; details of anchor seal all rubber flat pad.
Counters tunnel problem with long rails, rubber pads
Ry Eng Maintenance
Railway Engineering and Maintenance ; 48 , n 4
1952
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Bunk Pads for Reactable Variety Size of Trailer Rails
Europäisches Patentamt | 2019
|Compression characteristics of rubber pads
Tema Archiv | 1971
|