New Gunderson process introduces electric current and arsenic into boiler water; road equipping all power on strength of four years' tests; water treated to reduce hardness; corrosion eliminated; grooving of tubes at front flue sheet stopped; method of installation; maintenance expense and operating cost low.
Chicago and alton checks corrosion in locomotive boilers
Ry. Age
Railway Age ; 86 , n 15
1929
5 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Chicago and Alton "pacific" locomotive
Engineering Index Backfile | 1903
The Chicago and Alton installs mechanical plant
Engineering Index Backfile | 1929
New postal cars, Chicago and alton railroad
Engineering Index Backfile | 1898
Pacific locomotives for the Chicago and Alton
Engineering Index Backfile | 1908
Pacific type locomotives, Chicago and Alton R.R.
Engineering Index Backfile | 1908