Electrification of double-track line 37 km. long, grades up to 2.5 per cent, with 3 km. of tunnel; power is supplied from Ruetz and Achensee hydroelectric plants; details of steel transmission poles; service speeded up to 24 to 42 per cent; description of locomotives.
Electrification of the brenner pass railroad
Die Elektrisierung der Brennerbahn
Verkehrs Technik ; n 1
1929
6 pages
12 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1925
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1929
|