Temporary and immediate rehabilitation and improvement was made to preclude interruption to service; as rapidly as possible replacements in their entirety have been made or are being carried out in yearly steps; track and roadway were designed to meet demands of heavier and faster service; reelectrification was made dependent on standards adopted by Illinois Central Railroad on suburban terminal.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The rehabilitation of the Chicago south shore and South Bend railroad


    Weitere Titelangaben:

    Baldwin Locomotives


    Beteiligte:
    Jones, C.H. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1929


    Format / Umfang :

    8 pages


    Anmerkungen:

    12 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :