Data covering launching of 10,000-ton United States scout cruiser at Fore River plant of Bethlehem Shipbuilding Corp., at Quincy, Mass., indicate wide differences in detailed procedure from methods employed in launching Pensacola at Brooklyn Navy Yard; cradle and packing was in six sections on each side of ship; hydraulic triggers, one in each way cross-connected and located near Frame 70, were used for releasing ship.
Northampton launching methods
Mar. Eng. Shipg. Age
Marine Engineering and Shipping Age ; 34 , n 12
1929
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1904
TIBKAT | 1980
|The northampton traction company
Engineering Index Backfile | 1908