Information on -- historical background of Pametrada, which was formed in 1944, as turbine design and research organization for marine industry in Great Britain; ship installations; turbine arrangement designs for 10,000 to 35,000 shp, and also basic designs for powers down to 6000 shp; gearing designs; importance of shore trials; standard single cylinder design, suitable for cross-channel ship propulsion; development of plant suitable for final alignment and assembly at factory and transported as complete assembly to ship.
Pametrada standard turbines, present position and future outlook
Inst Mar Engrs -- Trans
Institute of Marine Engineers -- Transactions ; 77 , n 10
1965
26 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
Pametrada hydraulic transmission
IOS Press | 1962
|Pametrada hydraulic transmission
Engineering Index Backfile | 1961
|Pametrada hydraulic transmission
IOS Press | 1962
|Engineering Index Backfile | 1952