Electric power system of new aircraft factory of Sikorsky Corporation at Bridgeport is described; main manufacturing building has 100,000 sq. ft. floor space; 1200 men can be accommodated; establishment is served by United Illuminating Co. of Bridgeport through 600-kva. industrial substation; loop system of power supply was provided in manufacturing building to insure maximum power concentration at utilization points under every anticipated set-up of departmental production details of system.
Aircraft production speeded by electricity
Elec. World
Electrical World ; 95 , n 7
1930
3 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Underwater pipeline repair speeded
Tema Archiv | 1981
|Speeded-Up Robust Features (SURF)
British Library Online Contents | 2008
|SURF: Speeded Up Robust Features
British Library Conference Proceedings | 2006
|Freight handling speeded by electric cranes
Engineering Index Backfile | 1928