Method of regirdering single-track meter-gage bridge without interruption to traffic, is believed to be new and capable of modification to meet most cases; essential feature of scheme was service span to carry traffic over gap between any two piers while old permanent span was being removed and new one put in its place. (See also - discussion p 257-263)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    The regirdering of the railway-bridge over the Krishna river Madras and southern Mahratta railway, India


    Weitere Titelangaben:

    Instn. Civil Engrs. -- Min. Proc


    Beteiligte:
    Colam, N.N. (Autor:in)


    Erscheinungsdatum :

    1929


    Format / Umfang :

    12 pages


    Anmerkungen:

    1 Fig.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :