To take heavier loads, entirely new steel bridge 1410 ft in length, with six fixed spans and one opening span, was completed over Nile River at Nag Hamadi; old bridge now used for road traffic; brief illustrated description.
New Nile bridge, Egyptian state railways
Ry Gaz
Railway Gazette ; 71 , n 5
1939
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1932
Online Contents | 2004
|Station design on Egyptian State Railways
Engineering Index Backfile | 1937
Station design on Egyptian State Railways
Engineering Index Backfile | 1937
British Library Online Contents | 2004
|