Features of project undertaken by Pennsylvania Railroad at Cleveland, Ohio, where H-section bearing piles up to 91.5 ft long were used in rebuilding structure formerly supported by concrete piles.
Reconstructs failed ore dock wall at Cleveland
Ry Age
Railway Age ; 106 , n 4
1939
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Put new Cleveland dock in service
Engineering Index Backfile | 1915
|Berlin reconstructs its rail networks
Online Contents | 1995
South shore reconstructs interlocking
Engineering Index Backfile | 1934
|Pennsylvania reconstructs Juniata shops
Engineering Index Backfile | 1926
|Phoenix reconstructs its sky harbor airport
Engineering Index Backfile | 1949
|