Southern Pacific Railroad, co-incident with construction of Los Angeles Union passenger Terminal at Los Angeles, has constructed new passenger coach yard equipped with overhead battery charging and air conditioning facilities; power requirements consist of 230-v, 60-cycle energy for stand-by power service for Pullman mechanically air conditioned cars, and d-c power for battery charging. (see also Ry Age v 107 n 11 Sept 9 1939 p 367-71)
Mission road coach yard electrical facilities
Ry Elec Engr
Railway Electrical Engineer ; 30 , n 7
1939
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Mission road coach yard electrical facilities
Engineering Index Backfile | 1939
Northern Pacific Coach Yard facilities
Engineering Index Backfile | 1926
Cutting costs in the coach yard
Engineering Index Backfile | 1931
Modernizes coach servicing facilities
Engineering Index Backfile | 1948
Rebuilt coach yard provides passenger-car servicing -- De lux
Engineering Index Backfile | 1954