Planning of 66 aircraft gate terminal, featuring two wing buildings each with three flight pavilions accommodating up to 11 gates, designed for 1980 requirements; multi-deck automobile parking for 12, 000 cars is located over and adjacent to wing buildings, served by two-level roadway system with direct access to major expressways; passengers have short walk through protected connecting links to flight pavilions; Cargo City is also planned to accommodate coming jumbo freight aircraft and new buildings required for automated cargo processing. (See also ASCE Transportation Eng Conference -- Preprint 411 Oct 17-21 1966 22 p)
Facility planning for Philadelphia international airport
ASCE -- Proc (J Aero-Space Transport Div)
1967
12 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Facility planning for Philadelphia international airport
Engineering Index Backfile | 1966
|Forecasts for Philadelphia international airport
Engineering Index Backfile | 1967
|Forecasts for Philadelphia international airport
Engineering Index Backfile | 1966
|Airports - Airport development - Philadelphia International continues its growth trend
Online Contents | 2006