An account of the overhead cableway at Barzy. The distance is 3550 feet, with a difference in level of 456 feet; 3000 tons of stone are transported in 10 hours. (2500 w.)
Cableway for transportation of millstone
Chemin de Fer Aerien pour le Transport de Pierres Meulieres
1897
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.