Four have been despatched from France for working heavy freight trains on 3 ft 5 1/2 in. gage, Blidah-Djelfa Section; cylinders 16 1/2 by 22 in.; coupled wheels 3 ft 7 in.; boiler pressure 200 lb per sq in.; tractive effort at 75% boiler pressure 39,680 lb; total weight in working order 142 tons; total engine length oa 79 ft 1 3/4 in. (See also Ry Gaz v 56 n 6 Feb 5 1932 p 182-5; Locomotive v 38 n 474 Feb 15 1932 p 44-5)
Beyer-Garratt locomotives for P.L.M Algerian Lines
Ry Gaz
Railway Gazette ; 57 , n 6
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Beyer-Garratt locomotives for P.L.M Algerian Lines
Engineering Index Backfile | 1932
Beyer-Garratt locomotives for P.L.M Algerian Lines
Engineering Index Backfile | 1932
Beyer-garratt locomotives for Iran
Engineering Index Backfile | 1936
Beyer-Garratt locomotives for Queensland
Engineering Index Backfile | 1950
Beyer-Garratt locomotives for Tasmania
Engineering Index Backfile | 1930