Train operation by signal indication on 43 mi of single track increases track capacity of 56-mi heavy-traffic single-track line between North Lima, Ohio and Roachton; results accomplished; track and signal plan of centralized traffic control territory; control system; joint control of interlockings. (See also Ry Signaling v 25 n 2 and 4 Feb 1932 p 36-41 and 346 and Apr 1932 p 95-101)
Centralized traffic control on Baltimore and Ohio
Ry Age
Railway Age ; 92 , n 15
1932
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control on Baltimore and Ohio
Engineering Index Backfile | 1932
Centralized traffic control installed on Baltimore and Ohio
Engineering Index Backfile | 1932
Centralized traffic control and train control of Baltimore and Ohio Railroad
Engineering Index Backfile | 1933
|Centralized traffic control and train control of Baltimore and Ohio Railroad
Engineering Index Backfile | 1933
|Centralized traffic control on Chesapeake and Ohio
Engineering Index Backfile | 1935