Project on 34 mi of line increases flexibility of train operation and reduced operating expenses; general track layout; centralized control layout; train movements directed by signals; track and signal plan of centralized traffic control territory between Dover, N H, and Rigby, Me; benefits accomplished. (see also Ry Signaling v 25 n 6 June 1932 p 173-6 and 179)
Centralized traffic control on Boston and Maine
Ry Age
Railway Age ; 92 , n 22
1932
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control on Boston and Maine
Engineering Index Backfile | 1931
|Centralized traffic control on Boston and Maine
Engineering Index Backfile | 1932
Centralized traffic control on Boston and Maine
Engineering Index Backfile | 1931
|The Boston and Maine installs centralized control to increase track capacity
Engineering Index Backfile | 1929
|The Boston and Maine installs centralized control to increase track capacity
Engineering Index Backfile | 1929
|