Protracted troubles in high fill at Sibley, Mo, overcome by grid of pipe lines under roadbed at Atchison, Topeka and Santa Fe; measures taken to overcome sliding at time embankment was raised.
Stopping slides with effective drainage system
Ry Eng Maintenance
Railway Engineering and Maintenance ; 28 , n 6
1932
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Drainage system overcomes serious slides
Engineering Index Backfile | 1934
Stops slides with drainage and cinders
Engineering Index Backfile | 1939
Southern Pacific controls slides with drainage tunnels
Engineering Index Backfile | 1945
Highway Drainage Restored Without Stopping Traffic
British Library Online Contents | 1995