Stud welding employed in conversion from steel to pneumatically tired rolling stock at Parisian subway lines; additional track installation work accomplished using three separate stud welding operations, two of which were of "wood decking" type; welding problems; new track installation; materials and labor analysis; great improvements in traffic conditions noted; system to be extended to all lines of subway system.
Rubber-tyred trains for "Metro"
Welding Metal Fabrication
Welding and Metal Fabrication ; 26 , n 3
1958
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pneumatic-tyred trains on Paris metro
Engineering Index Backfile | 1957
Front end structure of cab of rubber-tyred train and chassis of rubber-tyred train
Europäisches Patentamt | 2024
|