Transportation of concentrate from Bong Range iron mine in Liberia is undertaken by 80 km long railroad; it terminates in newly constructed ship-loading installation with private port at which ships up to 50,000 gross tons can be accommodated and loaded; concentrate is brought to ore-loading installation by 800 tph conveyor system; three 3000 ton trains daily are unloaded in automatically operated rotary railroad car dumper which feeds hopper; hoppers supply conveying system connected to track-mounted stacker with 4000 tph loading capacity.
Ore handling installation in Monrovia
Min Minerals Eng
Mining and Mineral Engineering ; 1 , n 13
1965
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Estimation of PCE Factors for Traffic at Signalized Intersections for Capacity Analysis in Monrovia
Elsevier | 2025
|Modern fertilizer handling installation
Engineering Index Backfile | 1968
|