Construction of second deep water port in Ghana included 12 deep water berths, oil berth, small dry dock and slipways, large fishing harbor, with all supporting land installations, and start of 900-ft long graving dock and modern shipbuilding and shipbreaking yards; 17, 400 ft of rock breakwaters, whose form was determined by hydraulic model tests, and massive rock dredging, were features of development; new and economical design of concrete block wall was devised for 11,600 ft of quays which were built.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Port of Tema


    Weitere Titelangaben:

    Instn Civ Engrs -- Proc


    Beteiligte:
    Scott, P.A. (Autor:in)


    Erscheinungsdatum :

    1965


    Format / Umfang :

    43 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Port of Tema

    Engineering Index Backfile | 1962


    Impact of Tema port on urban development

    Addo, S. T. / Association International Villes et Ports | British Library Conference Proceedings | 1996



    TEMA UAV : Schlussbericht 2022

    Wiedemann, Simon / Hopper, Ted / Stuckmann, Christoph et al. | TIBKAT | 2022