Technique involves mobile jig platform which permits assembling of track in 240 ft lengths at railhead; jig accurately clamps rails at correct gage above sole plates and sleepers which are positioned in channels slots on mobile platform; supply gantry, operation sequence, mechanized ballasting, tracing of route with tunnels and bridges through difficult terrain in detail, savings with nestable type Armco culverts of 60-in. ID; foolproof operation, despite unskilled labor, was aided by electronic centralized traffic control signaling.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Prefab tracks speed construction of Swaziland railway


    Weitere Titelangaben:

    World Construction


    Beteiligte:
    Warden, W. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1965


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Construction of swaziland railway

    Davies, P.H. / Randall, H.C. | Engineering Index Backfile | 1966


    Major bridges on Swaziland railway

    Hawkins, L.A.W. | Engineering Index Backfile | 1963


    PREFAB LIGHTING DEVICE

    KIM WON SIK | Europäisches Patentamt | 2023

    Freier Zugriff

    Dynamic behavior of high-speed railway tracks

    Zakeri, J.A. / Xia, He / Fan, Jun-Jie | Tema Archiv | 2000


    Dynamic Behavior of High-Speed Railway Tracks

    Zakeri, J. A. / Xia, H. / Fan, J. J. et al. | British Library Conference Proceedings | 2000