Engineering report covers satellite, communications ground stations and telemetry and control ground stations; description of each of Syncom Satellite System Subsystems in addition to their operation and performance is presented; time period covered by report is from launch on July 26 1963 from Cape Canaveral through first 150 days in orbit.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Syncom engineering report


    Weitere Titelangaben:

    NASA -- Tech Report


    Erschienen in:

    Erscheinungsdatum :

    1966


    Format / Umfang :

    160 pages


    Medientyp :

    Report


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :