Divided hull, and longitudinal slide down construction systems were adopted to achieve total quality control at Tsurumi Shipyard of Nippon Kokan KK, Japan; two starting point system made it possible to reduce standard construction period to 75, 85 and 100 days for 30,000, 50,000 and 70,000 dw ton ships, respectively; adoption of so-called Kokan Quality Standards covering shipwright, fitting, welding, riveting, gas cutting and fairing conditions for construction.
Total quality control in shipbuilding
Nippon Kokan Kabushiki Kaisha -- Tech Report Overseas
1965
7 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Quality control in shipbuilding
Engineering Index Backfile | 1964
|SHIPBUILDING - Shipbuilding Politics - European shipbuilding politics
Online Contents | 1998
|SHIPBUILDING - Shipbuilding Politics - European shipbuilding politics
Online Contents
|Accuracy control. The keystone of quality in shipbuilding
Tema Archiv | 1998
|A function-oriented quality control method for shipbuilding
Taylor & Francis Verlag | 2019
|