Designed for 2-ft 6-in. gage Sierra Leone Government Railway with max axle load of five tons, locomotives have tractive effort of 22,990 lb at 85% boiler pressure and weigh in working order 66.3 tons, when loaded with four tons of coal and 1600 gal of water; length over buffers 63 ft 7 1/2 in.; couple wheel diam 2 ft 9 in.
Beyer-Garratt locomotives for Sierra Leone
Ry Gaz
Railway Gazette ; 104 , n 15
1956
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Beyer-garratt locomotives for Iran
Engineering Index Backfile | 1936
Beyer-Garratt locomotives for Queensland
Engineering Index Backfile | 1950
Beyer-Garratt locomotives for Tasmania
Engineering Index Backfile | 1930
"Beyer-Garratt" locomotives for Spain
Engineering Index Backfile | 1929
Beyer-garratt locomotives for dorada railway
Engineering Index Backfile | 1937