Proposal for 390-mi double track rapid transit web, designed to link San Francisco Bay area and surrounding suburban communities; routes would be constructed over 35-yr period at estimated cost of $ 1 1/2-billion; 700 high speed, 70-mph multiple unit cars would be needed, at estimated cost of $100-million.
Rail transit network
Ry Age
Railway Age ; 140 , n 8
1956
Map
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Controllability of Urban Rail Transit Network
British Library Conference Proceedings | 2018
|NTIS | 1977
|