To meet new demands and loads, City of Hammond, has installed system of nine automatically controlled pumping stations to augment sewage system under storm conditions; system has combined capacity of 195, 000 gpm provided by 21 motor driven angle-flow pumps operating during periods of abnormal flow; newest of stations is Hohmann-Munster station which serves as combined dry weather and storm water ejector plant.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Hammond, Ind. Solves Flood Problem


    Weitere Titelangaben:

    Nat Engr


    Erschienen in:

    Erscheinungsdatum :

    1956


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :




    Drainage solves problem

    Engineering Index Backfile | 1942


    Drainage solves problem

    Engineering Index Backfile | 1942


    New bulkhead solves problem

    Engineering Index Backfile | 1966