Coen vehicular tunnel near Amsterdam, under North Sea Canal. Aug 30 n 35 p B193-201: Planning and general design of project, A.EGGINK Sept 13 n 37 p B205-12: Construction methods, H.C.WENTINK. Sept 27 n 39 p B213-24: Ventilation and lighting, A.GRIFFIOEN. Oct 11 n 41 p B227-37: Execution of works, C.J.de VILDER.
The Coen tunnel
De Coentunnel
Ingenieur ; 75 , n 41 ; p B227-B237
1963
Aufsatz (Zeitschrift)
Niederländisch
© Metadata Copyright Elsevier B. V. All rights reserved.