Technical Commission appointed by Polish Ministry of Transport recommended adoption of 3000 v d-c as best system to be used, and locomotives, motor-coach equipments, and plant to be supplied for this contract will be suitable for operation on this voltage; six substations provided; converting plant consists of mercury-arc rectifiers; total capacity of installed equipment 29,500 kw; map of electrification scheme.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Electrification of Warsaw junction railway


    Weitere Titelangaben:

    English Elec J


    Erschienen in:

    Erscheinungsdatum :

    1933


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Electrification of Warsaw railway junction

    Podoski, J. | Engineering Index Backfile | 1948


    Electrification of Warsaw railway junction

    Podoski, J. | Engineering Index Backfile | 1948


    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1936


    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1937


    Electrification of Warsaw suburban railways

    Engineering Index Backfile | 1937