Improvement of station of Great Western Railway, London, put in hand 3 yr ago to extend length of platforms to enable them to take trains of from 16 to 18 coaches; practically whole of area required had to be provided by excavation and Westbourne bridge was lengthened by three spans to allow roadway of parcels depot to pass underneath; bridge is of plate-girder design. (See also - n 3535 Oct 13 1933 p 404-6, n 3537 Oct 27 p 457-9 and 466)
Paddington station improvements
Engineering
Engineering ; 136 , n 3542
1933
Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Paddington Station : through time
SLUB | 2010
|Book reviews - Paddington Station, 1833-1854
Online Contents | 2000
|IuD Bahn | 1998
|Engineering Index Backfile | 1934
British Library Online Contents | 2004