New system of laying out complicated point and crossing work preparatory to its installation in track has been in operation by London Midland and Scottish Railway since 1938, with resultant considerable economy in time of track occupation required; typical layout illustrated.
New point and crossing renewal methods, L.M.S.R.
Ry Gaz
Railway Gazette and Railway News ; 73 , n 15
1940
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Engineering Index Backfile | 1934
Reconstructed "Claughton" locomotives, L.M.S.R.
Engineering Index Backfile | 1930
Reconstructed "Claughton" locomotives, L.M.S.R.
Engineering Index Backfile | 1930