Specification of electrified routes now totaling 323 km. single track and 300 km. double track; organization of construction; electric lines; power supply and track conditions; Matinitz, Stubach, Ruetz and Spullersee hydroelectric plants totaling 90,000 hp. installed capacity; locomotive equipment.
Electrification of Austrian federal railroads until end of 1929
Die Elektrisierung der Oesterreichischen Bundesbahnen bis Ende 1929
Elektrotechnik und Maschinenbau ; 48 , n 38
1930
20 pages
19 Figs., bibliography
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Electrification of Austrian federal railroads
Engineering Index Backfile | 1930
|Electrification of former Austrian Federal Railroads
Engineering Index Backfile | 1938
|Electrification of former Austrian Federal Railroads
Engineering Index Backfile | 1938
|Electrification of former Austrian Federal Railroads
Engineering Index Backfile | 1938
|Electrification of Austrian railroads
Engineering Index Backfile | 1938
|