Project includes three power switches and six spring switches with signals at passing tracks located properly for future changeover to centralized traffic control; equipment includes coded track circuits. (See also Ry Signaling v 34 n 10 Oct 1941 p 553-9 and 572)
Signaling on 47 miles of St. Louis Southwestern
Ry Age
Railway Age ; 111 , n 19
1941
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1903
Ditching cars; St. Louis Southwestern Ry.
Engineering Index Backfile | 1896
St. Louis-southwestern installs centralized traffic control
Engineering Index Backfile | 1944
St. Louis-southwestern installs centralized traffic control
Engineering Index Backfile | 1944
Nashville, Chattanooga and St. Louis installs C.T.C. on 43 miles
Engineering Index Backfile | 1943