Comments and tentative conclusions with reference to system installed in S.S. Examiner, one of 8 cargo ships of Maritime Commission's C-3 E design built by Bethlehem Steel Co; machinery plant consists of single screw, double reduction geared turbines of 8000 shp; steam conditions of 7 vessels are 425 lb and 740 F; "Examiner" differs from other vessels only in portions of high pressure reheat cycle. (see also abstracts in Mar Eng and Shipg Rev v 46 n 12 Dec 1941 p 67-75 (discussion) 112, 114 and 116; Combustion v 13 n 6 Dec 1941 p 43)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    1200-pound reheat marine installation


    Weitere Titelangaben:

    Soc Naval Architects Mar Engrs -- Advance Paper


    Beteiligte:
    Fox, B. (Autor:in) / Tingey, R.H. (Autor:in)

    Kongress:

    Society of Naval Architects and Marine Engineers -- Meeting ; 1941 Examiner



    Erscheinungsdatum :

    1941


    Format / Umfang :

    26 pages


    Anmerkungen:

    2 Supp plates


    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    1200-pound reheat marine installation

    Fox, B. / Tingey, R.H. | Engineering Index Backfile | 1941


    1,200-pound reheat marine installation

    Engineering Index Backfile | 1942


    Marine reheat boilers today and tomorrow

    Tawse, D. / Haraguchi, O. / Suruki, K. | Tema Archiv | 1978


    High performance reheat marine steam propulsion plant

    Roy, D. / Miffitt, J. / Casey, J. et al. | Tema Archiv | 1977