Comments and tentative conclusions with reference to system installed in S.S. Examiner, one of 8 cargo ships of Maritime Commission's C-3 E design built by Bethlehem Steel Co; machinery plant consists of single screw, double reduction geared turbines of 8000 shp; steam conditions of 7 vessels are 425 lb and 740 F; "Examiner" differs from other vessels only in portions of high pressure reheat cycle. (see also abstracts in Mar Eng and Shipg Rev v 46 n 12 Dec 1941 p 67-75 (discussion) 112, 114 and 116; Combustion v 13 n 6 Dec 1941 p 43)
1200-pound reheat marine installation
Soc Naval Architects Mar Engrs -- Advance Paper
Society of Naval Architects and Marine Engineers -- Meeting ; 1941 Examiner
1941
26 pages
2 Supp plates
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
1200-pound reheat marine installation
Engineering Index Backfile | 1941
|1,200-pound reheat marine installation
Engineering Index Backfile | 1942
Marine reheat boilers today and tomorrow
Tema Archiv | 1978
|High performance reheat marine steam propulsion plant
Tema Archiv | 1977
|Norris electric reheat system -- Simplified installation for ship's air conditioning
Engineering Index Backfile | 1966