Advance planning and systematized construction kept street car service in Wilmington right up to day of changeover; in about 4 mo, trolley coach service involving 60 units was placed on 23 mi of street; engineering and construction crews had to be trained; storage and service facilities provided; operators taught to drive coaches.
From rail to trolley coach without interruption
Transit J
Transit Journal ; 85 , n 2
1941
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Wilmington "goes trolley coach"
Engineering Index Backfile | 1939
Engineering Index Backfile | 1934
|Modern trolley-coach operation
Engineering Index Backfile | 1937
|Recent trolley coach installations
Engineering Index Backfile | 1940