Record of basin trials, sea trials and commercial service for first British ocean-going gas turbine merchant ship; prototype was installed, and all test bed running carried out in basin trials; 6 mo service gave variety of climatic conditions; some compressor blades failed while ship was in service; reasons are given for withdrawal of ship from commercial service.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Trials and operation of gas turbine ship auris


    Weitere Titelangaben:

    Inst Mar Engrs -- Trans


    Beteiligte:
    Duggan, R.M. (Autor:in) / Howell, A.T.O. (Autor:in)


    Erscheinungsdatum :

    1962


    Format / Umfang :

    46 pages


    Anmerkungen:

    Folding sheet


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    "Auris" gas-turbine project

    Lamb, J. / Birts, L. | Engineering Index Backfile | 1958


    "Auris" gas-turbine project

    Lamb, J. / Birts, L. | Engineering Index Backfile | 1958


    "Auris" gas-turbine project

    Lamb, J. / Birts, L. | Engineering Index Backfile | 1958


    Auris statt Corolla: neuer Toyota Auris

    Ruch,P. / Toyota Motor,JP | Kraftfahrwesen | 2006