Outline of $41,000,000 Santee-Cooper hydroelectric power and navigation project, involving construction of two long dams, chiefly of earth and sand fill, dikes, power plant of 173,000-hp capacity and navigation lock, of 75-ft max lift, that will permit barge traffic from Charleston to go up Santee and Congaree rivers to Columbia.
Developing santee and cooper rivers
Eng News-Rec
Engineering News-Record ; 124 , n 21
1940
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Santee-Cooper project, South Carolina
Engineering Index Backfile | 1939
|Cooper Energy Services -- Cooper Bessemer
Online Contents | 1995
TIBKAT | 1987
|