Plan proposes that specialized group assume responsibility of selecting most economical among several proposed designs; they will make detailed cost analysis of each competing design, compare estimated cost per pound with similar parts made in past, and follow up to see that low cost ideas built into ship are used through tooling and manufacturing phases of production. (Trans) (see also Aero Digest v 48 n 1 Jan 1 1945 p 82-6, 208, 213)
Cost planning post-war small airplane
Soc Automotive Engrs -- J
Society of Automotive Engineers -- Journal ; 53 , n 3
1945
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cost planning post-war small airplane
Engineering Index Backfile | 1945
|Cost Planning the Post-War Small Airplane
SAE Technical Papers | 1945
|Engineering Index Backfile | 1918
|Engineering Index Backfile | 1947
|Engineering Index Backfile | 1930
|