Construction of 57 mi of tunnel and electrification included in plan for section of Southern Pacific Railroad; annual reduction of $7,667,100 in direct operating cost will amortize project cost in 27 yr.
Plan realignment of "Sierra Hump."
Western Construction News
Western Construction News ; 20 , n 11
1945
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1964
Engineering Index Backfile | 1963
METHOD OF GRAVITY HUMP OPERATION AND GRAVITY HUMP CONTROL SYSTEM
Europäisches Patentamt | 2016
|Engineering Index Backfile | 1964
|