Shipbuilding activities at shipyards of Burmeister and Wain, Copenhagen; insufficient supply of steel and coal prevent all-out ship production; largest cranes have load limit of 12 1/2 tons; material-handling equipment is limiting factor in size of assemblies to be built; prefabrication confined chiefly to double-bottom sections, forepeaks, deck plating, etc; because of shortage of welding equipment and of limited crane capacity, arc welding has not achieved wide application in Danish shipbuilding.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Denmark's largest shipyard goes back to work


    Weitere Titelangaben:

    Mar Eng Shipg Rev


    Beteiligte:
    Bartow, F.B. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1945


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Denmark's marine industries

    Online Contents | 1997


    Denmark's newest motor freighter

    Engineering Index Backfile | 1947


    Denmark's newest motor freighter

    Engineering Index Backfile | 1947


    Denmark's newest motor freighter

    Engineering Index Backfile | 1947