Methods and examples in dealing with problems of transition; high labor costs will be carried over with peacetime program; this implies insistence of general raising of efficiency throughout plant, and it is in this connection that time study standards of measurement can be called in to assist.
Time and motion study
Automobile Engr
Automobile Engineer ; 35 , n 467
1945
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1945
|Engineering Index Backfile | 1945
|Engineering Index Backfile | 1945
|Engineering Index Backfile | 1945
|