Modernization program, associated with approaching jet era discussed; sheltered entry for passengers and provision of fixed installations around aircraft at gate position such as fueling systems, d-c and a-c power supply from remote generators, underground manifold preconditioned air systems, pneumatic power for starting of jet engine, lavatory servicing, and baggage handling by conveyor systems. (see also abstract in Soc Automotive Engrs -- J v 65 n 6 May 1957 p 45-6)
Planning for handling jet transport at passenger terminal
Soc Automotive Engrs -- Paper
Society of Automotive Engineers -- Meeting ; 1957 Planning
1957
8 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Planning for handling jet transport at passenger terminal
Engineering Index Backfile | 1957
|Planning for Handling Jet Transports at the Passenger Terminal
SAE Technical Papers | 1957
|Passenger terminal baggage handling systems
IET Digital Library Archive | 1998
|Passenger terminal baggage handling systems
British Library Conference Proceedings | 1998
|Equipment - Passenger handling - Optimising terminal design
Online Contents | 2005