Installation devised by British Ropeway Engineering Co for transfer of ore from mine to ship at Port of Takoradi on Gold Coast; ropeways are used in two of six sections: gravity ropeway 8000 ft long conveying ore from mine to bunker at rail head, and under-type bicable ropeway loaded by chutes from bunker and transporting ore total distance of 6000 ft to bauxite berth.
Ropeways for handling bauxite
Mech Handling
Mechanical Handling ; 52 , n 4
1955
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1932
|Track ropes for ropeways and cranes
Tema Archiv | 1987
|Engineering Index Backfile | 1967
|