It has been found that to cover adequately early development needs of testing new design in entirely safe and economical manner, succession of at least three different vehicles, flying test laboratory, altitude wind tunnel, and aircraft installation, should be used; important items investigated in both operational and performance evaluation are enumerated.
Flight testing gas turbines
Aviation Week
Aviation Week ; 47 , n 6
1947
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Testing Battle Tank Gas Turbines
Online Contents | 1993
Emerald Group Publishing | 1951
|Performance Testing of Hydroelectric Turbines
British Library Conference Proceedings | 1998
|TURBINES - Advanced hydraulic turbine model testing
Online Contents | 1999
|GAS TURBINES - MS5002E Completes Validation Testing
Online Contents | 2004