Means of determining arithmetically, net effect on efficiency of car utilization of varying increases and decreases in tonnage in car and length of loading cycle.
Turn-around time vs. Average load
Ry Age
Railway Age ; 122 , n 14
1947
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
Engineering Index Backfile | 1937
Turn-around line generation method and system and turn-around method
Europäisches Patentamt | 2023
|Impact of Turn Around Time in Brazilian Navy Inventions
NTIS | 2000
|