Lifting of war time restrictions on new work undertaken, and release of materials from priorities, permitted railways to initiate many badly needed improvements; article gives detailed report by roads of all grade crossing work undertaken, and of all other construction projects completed during year, or still in progress at its close, individual cost of which approached or exceeded $100,000.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    1946 construction covered wide range


    Weitere Titelangaben:

    Ry Age


    Beteiligte:
    Boyd, G.E. (Autor:in)

    Erschienen in:

    Railway Age ; 122 , n 1


    Erscheinungsdatum :

    1947


    Format / Umfang :

    8 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Naval construction in 1946

    McMurtrie, F. | Engineering Index Backfile | 1947


    Construction of signaling was stepped up in 1946

    Peacock, M. | Engineering Index Backfile | 1947


    A Wide Area Covered Control System for Highway Equipment

    Yamada, S. / Yamada, Y. / Makino, S. | British Library Conference Proceedings | 1995