System evolved for renewal of single line track by mechanical means is described, which permits work to be carried out in intervals of time available between regular trains; new track is pre-assembled in central yard and laid with 10-ton locomotive crane. (See also - illus p 268-9)
Track renewal on Central Uruguay Railway
Ry Gaz
Railway Gazette ; 87 , n 10
1947
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstructed locomotives on Central Uruguay railway
Engineering Index Backfile | 1945
Recent improvements on the central Uruguay Railway
Engineering Index Backfile | 1930
Central Uruguay railway, 2-8-0 reconstructed locomotives
Engineering Index Backfile | 1939
Post-War locomotive for Central Railway of Uruguay
Engineering Index Backfile | 1945
|Central Uruguay railway, 2-8-0 reconstructed locomotives
Engineering Index Backfile | 1939